Installing An I/O Module; Required Tools; Installing A New I/O Module - Cisco Nexus 7000 Hardware Installation And Reference Manual

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Chapter 10
Installing or Replacing Components
Reconnect the console cable to the CONSOLE SERIAL PORT as explained in the
Step 18
Console" section on page
Step 19
If the previous supervisor module was connected to an asynchronous device through a modem, connect
the modem cable to the COM1/AUX SERIAL PORT as explained in the
section on page
Reconnect the network management cable to the MGMT ETH port as explained in the
Step 20
Management Interface" section on page
Reconnect the CMP cable to the CMP MGMT ETH port as explained in the
Step 21
CMP Port" section on page
Verify that the module has 4 GB of memory by using the system switchover command to make the
Step 22
downgraded module active and using the show system resources command.
If you need to downgrade the other supervisor module to 4 GB (both modules must have the same amount
Step 23
of memory), repeat Steps 2 through 21.
Verify that the downgraded module has 4 GB of memory. If there are two supervisor modules installed
Step 24
in the switch, use the system switchover command to make the downgraded module active, and then use
the show system resources command. If there is just one supervisor module installed in the switch, use
the show system resources command.
If you need to downgrade another supervisor module to 4 GB (both supervisor modules in a switch with
Step 25
two supervisors must have the same amount of memory), repeat Steps 2 through 24.

Installing an I/O Module

A Cisco Nexus 7004 switch has up to two I/O modules, a Cisco Nexus 7009 switch has up to seven I/O
modules, a Cisco Nexus 7010 switch has up to eight I/O modules, and a Cisco Nexus 7018 has up to 16
I/O modules. These modules are located on the front of the chassis. You can replace one of these modules
at a time while the switch is operating.
If you are installing F2 I/O modules, all of the fabric modules in the switch must be Series 2 fabric
Note
modules.
This section describes how to replace I/O modules and includes the following topics:

Required Tools

You need a flat-blade or number 2 Phillips-head screwdriver to loosen or tighten the captive screws on
the I/O module.

Installing a New I/O Module

A Cisco Nexus 7000 Series switch includes one or more of the following types of I/O modules:
OL-23069-07
7-2.
7-2.
7-5.
Required Tools, page 10-35
Installing a New I/O Module, page 10-35
7-4.
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Installing an I/O Module
"Connecting to the
"Connecting to the Console"
"Setting Up the
"Connecting the Supervisor
10-35