Required Tools And Equipment - Cisco Nexus 7000 Hardware Installation And Reference Manual

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Installing the Chassis
Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the
Warning
floor before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip
over. Statement 1048
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special
Warning
precautions to ensure that the system remains stable. The following guidelines are provided to
ensure your safety:

Required Tools and Equipment

You need the following tools and equipment to install the Cisco Nexus 7010 chassis:
You must use a mechanical lift whenever lifting a device over 120 pounds (55 kg).
Caution
Table 4-2
Part Description
12-24 x 3/4 in. Phillips screws
M6 x 19 mm Phillips screws
Adjustable bottom-support rails
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
4-8
Bottom-support rails installed in the rack or cabinet—You must already have two bottom-support
rails attached to the lowest possible rack unit on the chassis.
For more information, see the
page
4-4.
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest
component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in
Statement 1006
the rack.
Cisco Nexus 7010 chassis and its components are accounted for and undamaged.
For more information, see the
Mechanical lift capable of lifting at least 550 pounds (250 kg)
Number 1 Phillips-head screwdriver with torque capability
Bottom-support rails kit (shipped with the Cisco Nexus 7010 system accessory kit)
Part of this kit has already been used to install the bottom-support rails.
the rack-mount kit.
Contents for the Rack-Mount Kit
"Installing the Bottom-Support Rails on the Rack" section on
"Unpacking and Inspecting a New Switch" section on page
Quantity
20
20
2
Chapter 4
Installing a Cisco Nexus 7010 Chassis
Table 4-2
lists the items in
4-3.
OL-23069-07

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents