Cisco Nexus 7000 Hardware Installation And Reference Manual page 387

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Appendix A
Technical Specifications
Figure A-17
4
5
4
1
Cisco Nexus 7009 chassis
2
Cable management frames
3
Vertical rack-mount post
4
Vertical rack-mount post for neighboring rack 13 Side clearance recommended for open rack
5
Nearest object or inside of cabinet
6
Air intake from cold aisle for the power
supplies
OL-23069-07
Clearances Required for a Front-Mounted Cisco Nexus 7009 Chassis in a Four-Post
Rack
10
11
17.3 in
(43.9 cm)
9
8
3
1
3
2
6
12
14
3
4
15
16
4
3
17
7
18
10 Left side clearance required with an
unobstructed opening to the hot aisle to
exhaust air
11 Chassis width
12 Side clearance recommended for cabinet
installations:
use 11 inches (27.9 cm)
installations:
If next to another open rack, use 6 inches
(15.2 cm).
If next to a wall, use 11 inches (27.9 cm).
14 Rear service clearance required to replace fan
trays and fabric modules
15 Airflow clearance required between the
chassis rear and inside of cabinet (if used)
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Chassis Clearances
A-27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents