Cisco Nexus 7000 Hardware Installation And Reference Manual page 477

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Appendix E
Repacking the Cisco Nexus 7000 Series Switch for Shipment
Figure E-23
1
Align the two shorter side cushions to the
shorter inside crease in the center panel of the
box.
2
Align the two longer side cushions to the
longer inside crease in the center panel of the
box.
3
Place the door in the open space between the
side cushions.
Fold the box flaps over the door and tape them in place.
f.
Loosen and remove the eight screws holding the bottom hinge bracket for the door. Four of the
g.
screws are attached to the right and left side of the cable management frame (two screws on each
side) and four of the screws are attached to the chassis (see
parts bag.
Note
OL-23069-07
Packing the Front Door
Do not remove the top cover at this time. The top cover is part of the cable management frame.
4
Fold the two short flaps up along the end side
cushions and then fold them over the top of
the front door.
5
Fold the two long flaps up along the side
cushions and then fold them over the top of
the side flaps and door.
6
Tape the two long flaps together and to the
box with packing tape.
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Repacking the System Components
Figure
E-24). Place the screws in a small
E-39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents