Adding A Schedule Trigger - HP 316095-B21 - StorageWorks Edge Switch 2/24 User Manual

Fw v06.xx/hafm sw v08.02.00 hp storageworks ha-fabric manager user guide (aa-rs2ce-te, july 2004)
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Optional Features
3. Add an event trigger. See
4. Choose Time Limits from the Trigger list on the left to add a time limit to
Figure 71: Add Rule dialog box (Time Limits)
5. Choose Daily Time Limits or Weekly Time Limits from the Type
6. Click Add.
7. Add actions by selecting from the Actions list on the left. See

Adding a Schedule Trigger

You can add a schedule trigger to specify the time and date that an action should
be performed.
1. Click the Event Management tab on the main window. The Event
2. Click New. The Add Rule dialog box displays, as shown in
136
instructions.
the rule. The Time Limits information displays, as shown in
drop-down list.
— If you selected Daily Time Limits: Enter the start time and end time (in
military time format) in the Value fields and click Add.
— If you selected Weekly Time Limits: Enter the start time and end time in
(military time format) in the Value fields. Then, choose an option from
the Start Day and End Day drop-down lists and click Add.
Actions" on page 131 for instructions.
Management tab displays, as shown in
page 134.
"Adding an Event
Trigger" on page 133 for
Figure 69
Figure
71.
"About
on page 133.
Figure 70
HA-Fabric Manager User Guide
on

Advertisement

Table of Contents
loading

Table of Contents