Devices Toolbox; Planning A New San; New Plan Dialog Box - HP 316095-B21 - StorageWorks Edge Switch 2/24 User Manual

Fw v06.xx/hafm sw v08.02.00 hp storageworks ha-fabric manager user guide (aa-rs2ce-te, july 2004)
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Devices Toolbox

The Devices toolbox as shown in
planning window, provides tools to add, select, and connect devices in the
planned SAN.
1
2
3
4
5
6
Figure 93: Devices Toolbox

Planning a New SAN

1. Choose SAN > New Plan (or CTRL+N). The New Plan dialog box displays,
Figure 94: New Plan dialog box
2. Enter a name for the new plan in the New Plan field.
3. Click one of the following options:
4. Click OK.
HA-Fabric Manager User Guide
1
2
3
7
4
8
5
9
6
10
7
11
8
9
10 Insert Tape Drive
11 Insert NAS
as shown in
Figure
94.
— Click Start with discovered topology to use the discovered topology as
the basis for the new plan.
— Click Start Empty to start the new plan with an empty topology.
Figure
93, located on the right side of the
Select Devices
Insert HBA
Insert Switch
Insert Storage
Insert JBOD
Insert Server
Connect Devices
Insert Hub
Insert Bridge
Optional Features
175

Advertisement

Table of Contents
loading

Table of Contents