Start up CC MIS

This command starts up CC MIS after it has been shut down (not pow-
ered down). CC MIS is started after certain maintenance tasks have
been completed, such as automatically testing all configured ports.
Perform the steps below to start CC MIS.
Step 4-2: Starting CC MIS
1. Access the Maintenance and Administration menu.
2. Enter r to display the Run State Utilities menu.
3. From the Run State Utilities menu, enter s to start the CC MIS
system.
Note: CC MIS must be shut down to access the correct option.
The system displays the following messages:
Start the CC MIS system
Is the date and time [date and time] correct? (yes/no/quit)
Note: If the time and date are wrong, enter n. The prompt Enter the
correct time and date [mmddHHMMyy]: is displayed. Enter correct time and date
and press the <Return> key. The system displays the following message again:
Is the date and time [date and time] correct? (yes/no/quit)
Note: The time and date for the system are specified here (not read from the
switch - unless link is synchronized with switch). If the system experiences "drift-
ing time" it will need to be shut down and restarted and the date/time specified
again.
4. Enter y.
Note: Enter q to abort the startup and return to the menu.
The system displays the following messages:
Starting CC MIS. . . .
CC MIS has been started.
Press RETURN to continue.
5. Press <Return>.
The system displays the Run State Utilities menu. The third option has
changed to Shutdown the CC MIS System.