Power Up The Cc Mis System - Nortel CC MIS User Manual

Maintenance interface
Hide thumbs Also See for CC MIS:
Table of Contents

Advertisement

CC MIS
4-6

Power up the CC MIS system

The steps are used to power up both CC MIS and the UNIX operating
system. Power up CC MIS after it has been powered down using the
power down command. Perform the steps below to start CC MIS.
Perform only step 1 if the system was running but
Note:
was powered down. Perform all of the steps if the
system was shutdown prior to power down.
Step 4-4: Powering up CC MIS
1. Turn on power with the power button on the VME.
2. After the system has completed start up, the system displays the
following prompt:
Console login:
Note: System start up may take several minutes.
3. Enter maint The system displays the following prompt:
Password:
4. Enter the password. The Maintenance and Administration menu is
displayed.
5. Select the Run State Utilities option. The Run State Utilities menu is
displayed.
6. Enter s to start the CC MIS System. If the CC MIS was running before
the system was powered down, it will automatically be restarted.
The system displays the following messages:
Start the CC MIS system
Time:
Date:
Ready? (yes/quit)
7. Enter y. (Enter q to abort the startup and return to the Maintenance and
Administration menu.) The system displays the following messages:
Starting CC MIS. . . .
CC MIS has been started.
Press RETURN to return to the Main Menu.
8. Press <Return>
The system displays the Run State Utilities menu. The third option of
the menu has changed to "Shutdown the CC MIS System" because the
CC MIS is operating.
Release 5.2
297-2671-545

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cc mis 5.2

Table of Contents