Inspection Before Starting Work - TAJIMA TFMX-IIC User Manual

Table of Contents

Advertisement

Inspection before starting work

4.
Inspection before starting work
Before starting work, execute inspection (including cleaning, lubrication) of each part.
Place
Covers
Upper thread
Under thread
Needle
Rotary hook(→p.227)
Tension base switch(→p.66)
Needle bar suspension lever
(→p.67)
Middle thread guide adjusting lever
(→p.67)
Jog remote-controller(→p.23)
Needle bar suspension
lever
(Equipped only 2 or more
heads machine)
12
Covers might be attached incorrectly.
The thread might be passed incorrectly to each part.
The tension might be inadequate.
The thread might be entwined around frame/drive system.
The under thread (bobbin case) might not be set to rotary hook
correctly.
The tension might be inadequate.
The needle might be bent.
The direction of needle might have been wrong.
The needle might be broken.
Cleaning/lubrication might be performed in inadequate
frequency.
The switch of head to use might not be turned ON.
The switch of unused head might not be turned OFF.
Is the lever of head to use set to ON?
Is the lever of unused head set to OFF?
Is position correct?
Is it contained in the pocket?
Tension base switch
Middle thread guide adjusting lever
Checking
Jog remote-controller
It corresponds only to some models.
Chapter 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tfmx-cTwmx-cTfmxTfmxl

Table of Contents

Save PDF