Inspection, Repair - TAJIMA TFMX-IIC User Manual

Table of Contents

Advertisement

Inspection, Repair

5.

Inspection, Repair

Before inspection, be sure to turn off the original power supply. Some circuits are still
applied voltage eve if the original power supply was turned off. Wait until these circuits are
completely out of voltage (4 minutes) and then start working.
Attaching of each type of cover
Setting condition of embroidery
thread
Check breakage and/or bent of
needle.
Lubricating condition of each
section
Automatic lubrication system
Belt tension (main shaft, X/Y
drive system)
Before repairing the machine, be sure to turn off the original power supply. Some circuits
are still applied voltage eve if the original power supply was turned off. Wait until these
circuits are completely out of voltage (4 minutes) and then start working.
If the machine needs the repair, the repair must be done only by the service personnel
assigned and trained by Tajima or qualified technician. (Consult your distributor.) Do not
change the specification nor modify the parts of the machine without due consultation with
Tajima. Such modification may have the risk against the operational safety.
When restarting the machine after repairs, attach all covers etc. which were removed for
repair operation.
For the repair, use Tajima genuine parts for replacement.
PT10
Inspection Point
!
WARNING
Action
Attach all the covers.
Set it correctly.
Replace the needle.
Lubricate.
Refill oil.
Consult the distributor.
!
WARNING
!
CAUTION
Chapter 10
Inspection Cycle
At start of working
Once/3 months
235
1
2
3
4
5
6
7
8
9
10
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tfmx-cTwmx-cTfmxTfmxl

Table of Contents

Save PDF