CT SB2 User Manual
4.5
Additional wiring for burden measurement
Applicable for Advanced MR Test mode only.
Burden measurement may be performed separately or in conjunction with CT testing and/or primary
winding resistance measurement.
The following wiring is required for burden measurement (in addition to the basic measurement setup
shown in Figure 4-2 and Figure 4-3 and/or the additional wiring for primary winding resistance
measurement shown in Figure 4-5, as required).
CT
P2
P1
*
*
For information on how to connect the communication link between CT SB2 and CT Analyzer, please refer to section 4.2 on
page 17.
Figure 4-4: Additional wiring required for burden measurement
20
X6
X5
X4
X3
X2
X1
Basic CT wiring,
see Figure 4-2 or Figure 4-3
Burden
*
OMICRON