Canister Auto Change-Over - Stratasys Fortus 360mc User Manual

Hide thumbs Also See for Fortus 360mc:
Table of Contents

Advertisement

Canister Auto Change-over

Note: Included as part of the 4-bay system option. Not
available with standard 2-bay system.
1.
Auto Changeover allows you to leave a long part build unattended.
2.
When an active canister becomes empty:
A.
B.
Note: If the material to be loaded is not the same as the
material it is replacing, a material mis-match load error will
occur. The auto changeover will not occur and the system will
enter Pause mode.
3.
While the changeover is taking place, the user panel displays:
• No user interaction is required.
• Auto Changeover takes about five minutes.
4.
If you press the Pause key during an Auto Changeover, the system will
remain paused after the changeover is complete.
• You need to select Resume on the screen to continue building.
5.
If an error occurs during the Auto Changeover process, the system will
remain paused.
• Press the HELP key to determine the cause of the error.
• Once the error is resolved, select
The system is paused and the canister drive automatically withdraws
residual material from the system.
The full canister is pre-loaded, and then material is loaded to the head.
The build job is automatically resumed.
* Auto Changing Material*
* On Model Head
Please Wait .........
build job.
*
on the screen to continue the
Resume
4-20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents