Verifying The Rack Requirements; Rack Current Rating Consideration; Grounding; Temperature - Quantum P1000 Series User Manual

Automated tape library
Hide thumbs Also See for P1000 Series:
Table of Contents

Advertisement

Appendix B Installing the Slide Assembly in the Rack

Verifying the Rack Requirements

Rack Current Rating
Consideration

Grounding

Temperature

98
Verifying the Rack Requirements
Before installing the slide assembly in the rack, verify that the rack
meets the following requirements.
Consider the current rating of the rack before installing more than one
P1000 library. The P1000 library is rated 6A/3A (120V/230V). This
B
means that no more than two libraries can be installed in a typical
15A/120V rack.
If other equipment is installed in the rack, determine the total current
rating of all the equipment before adding the P1000 library to the rack.
The P1000 must be connected to a grounded power outlet. If the
B
library is rack-mounted, the rack must also be grounded.
The rack temperature should be less than 32 C.
B
ATL P1000 Series User's Guide
B

Advertisement

Table of Contents
loading

Table of Contents