Quantum Tape Library PX502 Quick Start Manual

Tape library
Hide thumbs Also See for Tape Library PX502:

Advertisement

PX502 Tape Library
Quick Start Guide

TABLE OF CONTENTS

Introduction .......................................1
Notational Conventions .................1
Choosing a Location ..........................2
Rack Space Requirements...............2
Taking ESD Precautions ..................2
Installing the Library .........................3
Installing the Library ......................4
Initial Configuration .....................11
Multiple Library Stacks....................15

Introduction

The PX502 tape library is an automated storage and retrieval device consisting of
up to two tape drives and up to 32 SDLT cartridges or 38 LTO tape cartridges (see
figure
1).

Notational Conventions

This instruction uses the following conventions:
N
: Notes emphasize important information related to the main topic.
OTE
C
:
Cautions indicate potential hazards to equipment and are included
AUTION
to prevent damage to equipment.
W
: Warnings indicate potential hazards to personal safety and are
ARNING
included to prevent injury.
This document explains how to unpack the PX502 tape library and install it in a
standard 19 in. rack. Once the library is unpacked and installed, set up the library
using the instructions in the
installation procedure will take approximately 4 hours to complete.
N
: It is recommended to review the entire document prior to beginning the
OTE
installation.
Figure 1 PX502 Tape Library
PX500 Series
User's Guide PN 81-81290. This
0
0

Advertisement

Table of Contents
loading

Summary of Contents for Quantum Tape Library PX502

  • Page 1: Table Of Contents

    PX502 Tape Library Quick Start Guide TABLE OF CONTENTS Introduction ...1 Notational Conventions ...1 Choosing a Location ...2 Rack Space Requirements...2 Environmental Conditions ...2 Preparing for the Installation ...2 Providing Necessary Tools ...2 Taking ESD Precautions ...2 Unpacking the PX502 Tape Library ...2 Installing the Library ...3 Locating the Mounting Position ...3 Installing the Library ...4...
  • Page 2: Choosing A Location

    PX502 Tape Library Quick Start Guide Choosing a Location When choosing an installation site for the PX502, consider the following requirements: • Rack Space Requirements • Environmental Conditions Rack Space Requirements Table 1 contains the rack requirements for the PX502 tape library.
  • Page 3: Installing The Library

    PX502 Tape Library Quick Start Guide By following these instructions, you help ensure that the system will continue to be safeguarded after it arrives at the installation site. : Unpack the library as close to the installation location as possible. Unpack and remove the following components from the packing materials (see figure...
  • Page 4: Installing The Library

    PX502 Tape Library Quick Start Guide Table 2 Rack Hole Types Figure Description Square rack holes are the most common type of rack holes. They can accept either cage nuts which mount from the back of the rail or clip nuts which clip on from the Cage nut side of the rack rail.
  • Page 5 PX502 Tape Library Quick Start Guide Table 3 Library Mounting Hardware Figure 4 metric and 4 standard 4 sets 2 sets 2 sets Installing the Rack Mount Shelves Before installing the rack mount shelves, you must collect the following information: Description •...
  • Page 6 PX502 Tape Library Quick Start Guide Figure 4 Rack Mount Shelf Depth Requirements Left shelf oriented with FlexLink™ opening toward front of rack Use these holes for rack depths of 24 in (60.9 cm) to 28 in (71.1 cm) Right shelf oriented with FlexLink opening toward back of rack Use these holes for rack...
  • Page 7 PX502 Tape Library Quick Start Guide Figure 6 Rail Adapter Types Use the rail adapters with blocks on rails with square hole patterns Use the rail adapters with circle pegs (opposite blocks) on rails with non-threaded circle hole patterns Use the rail adapters with small circle pegs on rails with threaded circle hole patterns (M6 on one side and...
  • Page 8 PX502 Tape Library Quick Start Guide Figure 8 Installing the Rack Mount Shelves Mounting plate M4 x 12 Allen screws Left shelf Right shelf 3 Once the rack mount shelves are secured to the rack, tighten the Allen screws securing the adjustable shelves (right and left) together (see figure Figure 9 Tightening the Rack...
  • Page 9 PX502 Tape Library Quick Start Guide Table 4 Back Mounting Bracket Orientation #1 Holes #2 Holes Back mounting clamp Rack Depth Back Mounting Bracket (Mounting Position) 24 to 25 in. Back bracket and clamp not required 25 to 26 in. Back bracket and clamp not required 26 to 27 in.
  • Page 10 PX502 Tape Library Quick Start Guide 3 Secure the back of the library to the rack with two mounting clamps (refer to table 4 the correct mounting holes to use) and two M5 x 10 Allen screws on each clamp (see : If the depth of the rack is less than 27 in, do not install the back mounting brackets or clamps.
  • Page 11: Initial Configuration

    PX502 Tape Library Quick Start Guide • Figure 17 Native Fibre Channel System Controller Board : Quantum ships sufficient SCSI cables and terminators with the libraries to set up two-drives per SCSI bus. One tape drive per SCSI bus may be necessary for optimum performance.
  • Page 12 PX502 Tape Library Quick Start Guide Figure 18 Turning on the Library Power button The power up sequence can take several minutes. The first message displaying will be “Are the internal packaging materials removed?” Continue with Removing the Remaining Packing Materials Removing the Remaining Packing Materials Now that you have installed the library chassis and powered on the system, you MUST remove the remaining packing...
  • Page 13 PX502 Tape Library Quick Start Guide 5 After the library has powered down, remove the foam restraints by completing the following steps (see figure 20): a Detach the tie band holding the two sides of the metal restraints together and remove it from the library.
  • Page 14 PX502 Tape Library Quick Start Guide Setting the Library Options To set the library options: 1 Turn on the library by pushing power button located on the bottom left-hand corner of the OCP (see 2 The OCP asks you: “Are the packaging materials removed?”...
  • Page 15: Multiple Library Stacks

    PX502 Tape Library Quick Start Guide 2 Use the up and down arrows to view or edit the time zone, date, and time information. Press Enter to accept the new settings. 3 When you are finished viewing/editing the date and time information, press Exit to return to the Setup screen.
  • Page 16 PX502 Tape Library Quick Start Guide Figure 25 Removing the FlexLink Cover Remove only the bottom FlexLink cover on the top library in the stack 2 The alignment hardware installed on the top and bottom of the libraries in a multiple stack allow the FlexLink bays to align correctly when installed in a rack.

Table of Contents