Figure 54 Positioning the
Slide Assembly
Slide assembly
Insert temporary support screw here
Determining the Mounting Position
To determine the mounting position of the slide assembly within the
rack:
Procedure
Locate the desired mounting position for the library (see figure 54).
1
The library and slide assembly require at least 21 in. (54 cm or 12
rack units) of vertical clearance. To ensure stability, mount the
library low in the rack.
0.5 in. (12.7 mm)
0.625 in. (16 mm)
0.625 in. (16 mm)
0.5 in. (12.7 mm)
Mounting bracket
Locking bracket
As indicated in figure 54, the bottom edge of each slide assembly
bracket must line up with the end of a rack unit.
If the rack retma rail holes are not threaded, attach the appropriate
2
threaded clips to the holes that correspond to:
the mounting bracket tabs (front and back)
•
•
the locking bracket tabs (front only)
the temporary support screws (front and back)
•
ATL P1000 Series User's Guide
Appendix B Installing the Slide Assembly in the Rack
Determining the Mounting Position
1 rack unit (1.75 in. / 4.45 cm)
Rack retma rail
0.5 in. (12.7 mm)
0.625 in. (16 mm)
1 rack unit
B
21 in. (54 cm
or 12 rack units)
minimum vertical
clearance required
99