Unpacking The P1000; Unloading Space Requirements - Quantum P1000 Series User Manual

Automated tape library
Hide thumbs Also See for P1000 Series:
Table of Contents

Advertisement

Unloading Space
Requirements

Unpacking the P1000

This section explains how to receive and unpack the P1000.
Note: If you have already unpacked the library following the procedures in
the ATL P1000 Series Unpacking Instructions, skip ahead to "Preparing
and Inserting Tape Cartridges" on page 30.
This procedure consists of the following steps:
receiving the library from the shipper
uncrating the library
checking the contents of the shipping carton and accessories tray
installing the slide assembly in the rack (rack-mount library only)
removing the library from the pallet
removing the internal packing materials from the library
Note: Before performing the procedures in this section, verify that the
installation site meets the requirements listed in "Site Requirements"
on page 14.
Before uncrating the library, verify that you have sufficient space. For
the stand-alone unit, allow a minimum of six feet in front of the ramp
2
side of the pallet (see figure 12 on page 18).
Note: Unpack the library as close to the installation site as possible.
ATL P1000 Series User's Guide
Chapter 2 Installing the P1000 Library
Unpacking the P1000
2
17