Turning On the Library
Placing the Library
On-line
Performing Manual Operations
This section describes procedures requiring operator intervention.
These procedures consist of:
•
turning the library on
placing the library on-line
•
placing the library off-line
•
•
turning the library off
inserting tape cartridges
•
opening the library doors
•
manually ejecting a tape cartridge
•
To turn on the library:
3
Procedure
Verify that:
1
all internal packaging is removed
•
•
the front doors and load port are closed
the library enclosure is installed
•
all back panel connections are secure
•
At the front panel, set the AC power switch on.
2
After several seconds, verify that the GUI comes on.
3
To place the library on-line:
3
Note: You must have Operator level access privileges or higher to perform
this procedure (see "Changing the GUI Security Level" on page 49).
Procedure
With the library turned on and the GUI indicating "System Off-
1
line," press the Standby button on the GUI.
Verify that the GUI displays "System On-line."
2
ATL P1000 Series User's Guide
Chapter 3 Basic Operations
Performing Manual Operations
3
51