To Run Complete Performance Verification Tests Using A Serial Or Telnet Connection - Agilent Technologies E5900B User Manual

Hide thumbs Also See for E5900B:
Table of Contents

Advertisement

CAUTION:
3 In the system window, select the emulation probe icon then select
4 Select Start PV.
1 Connect an SMB cable between BREAK IN and TRIGGER OUT on the
2 Disconnect the probe/module interconnect cable.
3 Turn off the emulation probe and disconnect the emulation probe from
CAUTION:
4 Connect the emulation probe to your PC or workstation using a serial
5 Use a telnet or a terminal emulator to connect to the emulation
6 Enter the pv 1 command.
See Also
Troubleshooting the Emulation Probe
Problems with the Emulation Probe
Disconnect the emulation probe from your target system before running the
Performance Verification tests. Running the Target Board Adapter Feedback
Test (which is part of the pv test) with the target system connected can
damage components on the target system.
Performance Verification.
The results will appear on screen.
To run complete performance verification tests using a
serial or telnet connection
front panel of the emulation probe.
your target system, then turn the emulation probe on again.
Disconnect the emulation probe from your target system before running the
Performance Verification tests. Running the Target Board Adapter Feedback
Test (which is part of the pv test) with the target system connected can
damage components on the target system.
or LAN connection, as described in "Connecting the Emulation Probe
to a Site LAN" on page 28.
probe.
Options available for the pv command are explained in the help screen
displayed by typing help pv or ? pv at the prompt.
152
Emulation for the Motorola M•CORE

Advertisement

Table of Contents
loading

Table of Contents