Connection Sequence; To Power On The System; To Power Off The System - Agilent Technologies E5900B User Manual

Hide thumbs Also See for E5900B:
Table of Contents

Advertisement

Connection Sequence

Disconnect power from the target system, emulation probe, and logic analyzer
before you make or break connections.
1 Connect the emulation probe to a LAN (page 25).
2 Connect the emulation probe to your target system (page 57).
3 Configure the emulation probe (page 63).

To power on the system

With all components connected, power on your system as follows:
1 Logic analyzer, if you are using one.
2 Emulation probe.
3 Your target system.

To power off the system

Power off your system as follows:
1 Your target system.
2 Emulation probe.
3 Logic analyzer, if you are using one.
Emulation for the Motorola M•CORE
To connect the emulation probe to a power source
Using the Emulation Probe
75

Advertisement

Table of Contents
loading

Table of Contents