If A Performance Verification Test Fails; Test 1: Powerup Pv Results; Test 2: Emulation Module Port Feedback Test; Test 3: Run Control Fpga Test Test 4: Run Control Clock Test - Agilent Technologies E5900B User Manual

Hide thumbs Also See for E5900B:
Table of Contents

Advertisement

Troubleshooting the Emulation Probe
Problems with the Emulation Probe

If a performance verification test fails

There are some things you can do if a failure is found on one of the tests.
Details of the failure can be obtained through using a -v value ("verbose
level") of 9.
I f t h e p a r t i c u l a r f a i l u r e y o u s e e i s n o t l i s t e d b e l o w , c o n t a c t A g i l e n t T e c h n o l o g i e s f o r a s s i s t a n c e .

Test 1: Powerup PV Results

Failure of this test indicates a hardware problem with the emulation probe.
Contact Agilent Technologies for assistance.

Test 2: Emulation Module Port Feedback Test

Failure of this test indicates a hardware problem with the emulation probe.
Contact Agilent Technologies for assistance.
This test exercises the hardware which drives the connection to the emulation
module. It does not test the module/probe interconnect cable.
The test is not executed if the emulation probe is connected to an emulation
module.
Test 3: Run Control FPGA Test
Test 4: Run Control Clock Test
Failure of these tests indicates a hardware problem with the emulation probe.
Contact Agilent Technologies for assistance.
If the emulation probe fails one of these tests, it may have been damaged by
electrostatic discharge through the target cable. To prevent such damage in
the future, follow standard ESD preventive practices.

Test 5: Break In and Trigger Out SMB Feedback Test

Before returning to Agilent Technologies, check to ensure that you have
connected a good cable between the two SMB connectors.
154
Emulation for the Motorola M•CORE

Advertisement

Table of Contents
loading

Table of Contents