Complete Performance Tests; Recommended Calibration Cycle; Test Record - Agilent Technologies 53147A Assembly Level Service Manual

Microwave frequency counter/power meter/dvm
Table of Contents

Advertisement

Chapter 1 Performance Tests
Introduction

Complete Performance Tests

The Complete Performance Tests verify the specifications listed in
Chapter 6, "Specifications." All tests can be performed without opening
the instrument.

Recommended Calibration Cycle

The instrument requires periodic verification of operation. Depending on
the type of use, environmental conditions, aging, and measurement
accuracy required, the instrument should be checked using the operational
verification procedure at least once every year. A full Calibration and
Performance Test should be performed each time the instrument changes
environment or if an assembly or module has been replaced.

Test Record

The results of the Operational Verification and the Complete Performance
Tests should be recorded on a copy of the Performance Test Record, located
at the end of the Complete Performance Test section in this chapter.
Assembly Level Service Guide
1-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

53148a53149a

Table of Contents