Problems With The Emulation Probe; To Run The Emulation Probe Performance Verification Tests; To Run The Performance Verification Tests Using The Logic Analysis System - Agilent Technologies E5900B User Manual

Hide thumbs Also See for E5900B:
Table of Contents

Advertisement

Problems with the Emulation Probe

To run the emulation probe performance verification
tests
In addition to the powerup tests, there are several additional performance
verification (PV) tests available.
These tests can be performed through a 16700-series logic analysis system or
via a serial or telnet connection.
Before running probe performance verification:
• Leave the emulation probe connected to the LAN and to the power supply
or module/probe interconnect cable.
• Leave the target board adapter installed inside the emulation probe.
• End any Emulation Control Interface or debugger sessions.
• Disconnect the target cable from the target system. (Power off the
emulation probe while you do this.)
• Connect an SMB cable from the "Break In" connector to the "Trigger Out"
connector on the front panel of the emulation probe. (If you aren't
concerned about these signals, you may omit this step and ignore any
related test failures.)
To run the performance verification tests using the
logic analysis system
1 End any Emulation Control Interface or debugger sessions.
2 Turn off the emulation probe and disconnect the emulation probe from
your target system, then turn the emulation probe on again.
Emulation for the Motorola M•CORE
Troubleshooting the Emulation Probe
Problems with the Emulation Probe
151

Advertisement

Table of Contents
loading

Table of Contents