Thermo Scientific Dionex ICS Series Operator's Manual page 76

Vwd variable wavelength detector
Hide thumbs Also See for Dionex ICS Series:
Table of Contents

Advertisement

Dionex VWD Operator's Manual
9. Align the flange of the new lamp with the locating pin (see
then gently push the lamp into the lamp housing. When the lamp is seated,
tighten the screws in the flange.
To ensure proper performance, the lamp must be fully seated.
10. Squeeze the clip on the deuterium lamp connector and reconnect it to its
source.
11. Reinstall the lamp housing cover.
12. Replace the detector front cover.
13. Turn on the detector power.
The lamp age counter (UVLampOnTime) is automatically reset to the value
stored on the lamp's chip card.
14. Start the Chromeleon server.
15. Start the pump flow and turn on the lamp.
NOTE Allow the new deuterium lamp to run for at least
68
24 hours before the first analysis. During this time,
strong baseline fluctuations and increased noise may
occur.
You can use the Smart Startup feature in Chromeleon 7
or Chromeleon 6.8 to monitor the detector signal and
notify you when the detector is ready for operation. For
details, refer to the Chromeleon Help.
Figure
5-3), and
Doc. 065377-01 1/12

Advertisement

Table of Contents
loading

Table of Contents