Running a Performance
Test
Note the following before running:
The Performance Test can only run from the
l
Wired Test Port
and an
successfully to establish link on the port. If
you receive a Status message such as "The
wired test port is not linked" or "No IP
address" but you have an active network
connection, go to AutoTest and run a Wired
Profile to troubleshoot your connection.
All configured Performance Test
l
tested at the same time. If one Service fails
to meet the thresholds for the test, the
entire test fails.
Only four Services can run at once. If you
l
have selected more than four Services in the
Performance
Status message, "Too many services enabled
(56)."
(top RJ-45 or Fiber port),
AutoTest Wired Profile
Settings, the test fails with the
Performance Test App
695
must connect
Services
are
Need help?
Do you have a question about the EtherScope nXG Controlled Edition and is the answer not in the manual?
Questions and answers