Running A Performance Test - netAlly EtherScope nXG Controlled Edition User Manual

Table of Contents

Advertisement

Running a Performance
Test
Note the following before running:
The Performance Test can only run from the
l
Wired Test Port
and an
successfully to establish link on the port. If
you receive a Status message such as "The
wired test port is not linked" or "No IP
address" but you have an active network
connection, go to AutoTest and run a Wired
Profile to troubleshoot your connection.
All configured Performance Test
l
tested at the same time. If one Service fails
to meet the thresholds for the test, the
entire test fails.
Only four Services can run at once. If you
l
have selected more than four Services in the
Performance
Status message, "Too many services enabled
(56)."
(top RJ-45 or Fiber port),
AutoTest Wired Profile
Settings, the test fails with the
Performance Test App
695
must connect
Services
are

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EtherScope nXG Controlled Edition and is the answer not in the manual?

Questions and answers

Table of Contents