Procedure
Step 1 Obtain an engineering label and a label plate, as shown in
Figure 3-80 Label and label plate
Step 2 Attach the label in the center of the plate.
Step 3 Bind the cable tie 20 mm [0.79 in.] away from the plug, as shown in
Figure 3-81 Binding the cable tie
Step 4 Tighten the cable tie to attach the label, as shown in
Issue 02 (2011-09-10)
The label on the PDF side is marked with B03- -48V2. It indicates that the cable is for
-48V2 DC supply and is connected to the cabinet in row B, column 03.
Label Plate
Label
A05 PGND
NOTE
You can attach the label on either side of the plate. Consistency, however, must be maintained in actual
situations.
NOTE
By default, the label is attached 20 mm [0.79 in.] away from the connector. If required, you can change
the position to facilitate smooth installation. Consistency and neatness, however, must be maintained.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
Figure
3-80.
Figure
Figure
3-82.
3-81.
66

Advertisement

loading

This manual is also suitable for:

Ne80e