Download Print this page

Huawei NetEngine80E Installation Manual page 24

Hide thumbs Also See for NetEngine80E:

Advertisement

HUAWEI NetEngine80E Router
Installation Guide
Step 7 Check the cabinet according to the following requirements:
l Check the appearance of the cabinet. Ensure that the exterior (especially the bottom) of the
l Check the cabinet door. Ensure that the cabinet door can be opened and closed normally.
l Check the surface of the cabinet. Ensure that the surface of the cabinet is clean, neat and
l Check the labels on the cabinet. Ensure that the labels on the cabinet are correct, legible and
----End
2.3.3 Unpacking the Carton
In general, cartons are used to pack cables, boards, and terminal devices.
Procedure
Step 1 Read the carton label carefully to know the types and quantities of the boards in the carton.
Step 2 Use diagonal pliers to cut the packing straps.
Step 3 Use a paper knife to cut the tapes along the seams of the carton cover. Do not insert the paper
knife to extra depths; otherwise, the contents inside the carton may get damaged.
Step 4 Open the carton and take out the foam plates.
Step 5 Check the label of the box that contains the board, and see whether the board quantity is consistent
with the quantity indicated on the carton label. Then, take out the boxes.
Step 6 Wear an ESD wrist strap and ground it correctly. Unpack the ESD bag that contains the board.
Check whether the board has any obvious damages.
Step 7 Check the types and quantity of the boards in the carton according to the Packing List. The
Packing List must be confirmed and signed on site by the customer.
Figure 2-4
Issue 02 (2011-09-10)
cabinet is intact, free from water penetration, distortion, and rust.
completely painted.
complete.
shows the procedure for unpacking the carton.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Preparing for the Installation
16

Advertisement

loading

This manual is also suitable for:

Ne80e