Download Print this page

Huawei NetEngine80E Installation Manual page 102

Hide thumbs Also See for NetEngine80E:

Advertisement

HUAWEI NetEngine80E Router
Installation Guide
Table 5-3 Checklist for the installed cables inside the cabinet
No.
1
2
Signal Cables
Table 5-4
Table 5-4 Checklist for the installed signal cables
No.
1
2
3
4
5
Issue 02 (2011-09-10)
Check Item and Description
The cables are connected properly and
firmly.
The cable ties do not overlap. They are cut
smoothly and evenly at both ends without
any burr or sharp edge.
lists the items that need to be checked for the installed signal cables.
Check Item and Description
All the signal cables have passed the
continuity test before they are laid.
The signal cables are not laid over the
heat-dissipation mesh of the cabinet.
Adequate space is provided for the cables
at the turning points. The cables cannot
be compressed at the turning points.
The cables are straight and smooth. The
cables inside the cabinet are not crossed
and the cables outside the cabinet are
bundled.
Each signal cable is clearly labeled at both
ends. The labels face the same direction.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Powering on Devices
Method
-
-
Method
-
-
Check this according to the following
figure.
-
-
94

Advertisement

loading

This manual is also suitable for:

Ne80e