Figure 3-3 Putting the heat shrink tubing onto the bare crimping terminal
Step 3 Put the OT terminal onto the exposed conductor, and ensure that the OT terminal is in good
contact with the insulation of the power cable, as shown in
After the conductor is fed into the OT terminal, the protruding part of the conductor, or L2 in
Figure
Step 4 Crimp the joint parts of the bare crimping terminal and the conductor, as shown in
Figure 3-4 Crimping the joint parts of the bare crimping terminal and the conductor
Step 5 Push the heat shrink tubing (A) towards the connector until the tube covers the crimped part,
and then heat the tube by using a heat gun, as shown in
Issue 02 (2011-09-10)
CAUTION
3-3, must not be longer than 2 mm (0.08 in.).
NOTE
The shapes of crimped parts may vary with the crimping dies.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
Figure
3-3.
Figure
3-5.
Figure
3-4.
23

Advertisement

loading

This manual is also suitable for:

Ne80e