Download Print this page

Huawei NetEngine80E Installation Manual page 158

Hide thumbs Also See for NetEngine80E:

Advertisement

HUAWEI NetEngine80E Router
Installation Guide
Figure D-16 Labels for AC power cables
Meaning of the label in
l
l
Issue 02 (2011-09-10)
Figure
On the loaded cabinet side, the label "A01-AC" indicates that the power cable is connected
to the socket of Row A and Column 01 in the machine room.
On the power socket side, the label marked with "B01-AC1" indicates that the power cable
is connected to AC power socket on Row B, Column 01 in the machine room.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
D-16.
D Engineering Labels for Cables
150

Advertisement

loading

This manual is also suitable for:

Ne80e