Download Print this page

Huawei NetEngine80E Installation Manual page 36

Hide thumbs Also See for NetEngine80E:

Advertisement

HUAWEI NetEngine80E Router
Installation Guide
Figure 3-12 Stripping a power cable (cord end terminal)
Table 3-3 Mapping between the cross-sectional area of the conductor and the value of L1
Cross-
Sectional Area
of Conductor
(mm
1 (0.002)
1.5 (0.002)
2.5 (0.004)
4 (0.006)
6 (0.009)
Step 2 Putting the cord end terminal onto the conductor, and ensure that the conductor is aligned with
the edge of the cord end terminal, as shown in
After the conductor is fed into the cord end terminal, the protruding part of the conductor must
not be longer than 1 mm (0.04 in.).
Issue 02 (2011-09-10)
Value of L1 (mm
(in.))
2
2
(in.
))
8 (0.31)
10 (0.39)
10 (0.39)
12 (0.47)
14 (0.55)
CAUTION
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
Cross-Sectional
Area of Conductor
2
2
(mm
(in.
))
10 (0.015)
16 (0.025)
25 (0.039)
35 (0.054)
50 (0.077)
Figure
3-13.
Value of L1 (mm
(in.))
15 (0.59)
15 (0.59)
18 (0.71)
19 (0.75)
26 (1.02)
28

Advertisement

loading

This manual is also suitable for:

Ne80e