Figure 3-8 Putting the heat shrink tubing onto the bare crimping terminal
Step 3 Put the bare crimping terminal onto the exposed conductor, and ensure that the bare crimping
terminal is in good contact with the insulation of the power cable, as shown in
Step 4 Crimp the joint parts of the bare crimping terminal and the conductor, as shown in
Figure 3-9 Crimping the joint parts of the bare crimping terminal and the conductor (JG terminal)
Step 5 Push the heat shrink tubing towards the connector until the tube covers the crimped part, and
then heat the tube by using a heat gun, as shown in
Figure 3-10 Heating the heat shrink tubing (JG terminal)
Issue 02 (2011-09-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
Figure
3-10.
Figure
3-8.
Figure
3-9.
26

Advertisement

loading

This manual is also suitable for:

Ne80e