Download Print this page

Huawei NetEngine80E Installation Manual page 32

Hide thumbs Also See for NetEngine80E:

Advertisement

HUAWEI NetEngine80E Router
Installation Guide
Figure 3-5 Heating the heat shrink tubing
When you heat the heat shrink tubing, do not heat it too long.
----End
3.2.2 Assembling the JG Terminal and Power Cable
This topic describes how to assemble a JG terminal and a power cable.
Context
Figure 3-6
Figure 3-6 Components of a JG terminal and a power cable
A. JG terminal B. Heat-shrinkable tube C. Insulation layer of a power cable D. Conductor of a power cable
Issue 02 (2011-09-10)
CAUTION
shows the components of a JG terminal and a power cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
24

Advertisement

loading

This manual is also suitable for:

Ne80e