Download Print this page

Huawei NetEngine80E Installation Manual page 54

Hide thumbs Also See for NetEngine80E:

Advertisement

HUAWEI NetEngine80E Router
Installation Guide
l
Issue 02 (2011-09-10)
2.
Mount a matching screw and fasten it in the clockwise direction, as shown in
3-44.
Figure 3-44 Installing two terminals back to back
CAUTION
Ensure that the OT terminal is not in contact with other terminals or metal components.
3.
Move the cable slightly and ensure that it is securely connected, as shown in
3-45.
Figure 3-45 Installed OT terminal
Install two OT terminals on a post.
Before you install two OT terminals on a post, ensure that the two terminals can be installed
on the post and that the electrical connecting pieces have a large contact area. Two OT
terminals can be installed using any of these methods:
– Bend the upper OT terminal at a 45- or 90-degree angle, as shown in
– Cross the two terminals, as shown in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
Figure
3-47.
Figure
Figure
Figure
3-46.
46

Advertisement

loading

This manual is also suitable for:

Ne80e