HUAWEI NetEngine80E Router
Installation Guide
Figure 3-63 Fastening the locking nut
Step 5 To disassemble an FC fiber connector, loosen the locking nut in the counterclockwise direction,
as shown in
Figure 3-64 Disassembling an FC fiber connector
----End
Installing an LC Fiber Connector
This section describes how to install an LC fiber connector.
Procedure
Step 1 Remove the dustproof cap of the LC fiber connector and store it for future use.
Step 2 Align the core pin of the male connector with that of the female connector, as shown in
3-65.
Issue 02 (2011-09-10)
Figure
3-64.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 On-site Cable Assembly and Installation
Figure
58
Need help?
Do you have a question about the NetEngine80E and is the answer not in the manual?
Questions and answers