MacDon M 2009 Series Assembly Instructions Manual page 61

Table of Contents

Advertisement

E
D
2. Locate boot (D) on lift linkage
re-install pin (C). Pin may be installed from
either side of boot.
3. Secure pin (A) with hairpin.
4. Repeat for opposite side.
F
b. Remove hairpin on pin s (F), and rem ove pins
from header legs.
CAUTION
Check to be sure all bystanders have
cleared the area.
Form 169542
UNLOADING AND ASSEMBLY
C
c. Start the en gine, and activate HEADER DOWN
(E), and
d. Slowly drive windrower forward so that boots (D)
e. Check that l inkages are properly engaged in
f.
61
HEADER UP
HEADER
TILT DOWN
HEADER DOWN
button on th e GSL to fu lly retract header lift
cylinders.
G
enter header legs (G). Continue to drive slowly
forward until lift linkages contact support plates in
the header legs, and header nudges forward.
header legs, contacting support plates.
REEL DOWN
HEADER
TILT DOWN
Adjust the position of the center-link cylinder with
the REEL UP and REEL DOWN switches, and
HEADER TILT switches on the GSL to position
the hook above the header attachment pin.
HEADER TILT UP
D
REEL UP
HEADER TILT UP
(continued next page)
Revision F

Advertisement

Table of Contents
loading

This manual is also suitable for:

M seriesM205M155

Table of Contents