Trying Out The Instrument - R&S NGM202 User Manual

Hide thumbs Also See for NGM202:
Table of Contents

Advertisement

®
R&S
NGL200/NGM200
Fuse rating
The R&S NGL/NGM uses the same fuse ratings for all mains voltages.
To change power fuse:
1. Peel off the yellow label sticker on the AC inlet.
2. Release the latch of the fuse holder which is located at both side of the socket and
pull it out.
3. Pull out the removable part of the fuse holder.
4. Turn this removable part until the correct voltage label (100, 115 or 230) is dis-
played in the window of the holder.
5. Return the fuse holder to its position in the panel.
To switch on instrument:
1. Connect the power cable to the AC power connector on the rear panel of the
R&S NGL/NGM.
2. Connect the power cable to the socket outlet.
3. Press [Power] key on the front panel.
The instrument performs a system check, boots the operating system, and starts
the R&S NGL/NGM firmware.
By default, all output channels are turned off when the instrument is switched on to
prevent connected loads from being damaged unintentionally.
During startup, the R&S NGL/NGM is loaded with the last saved instrument settings
from internal memory. See
To switch off instrument:
1. Press [Power] key.
All current settings are saved to internal memory and the firmware shuts down.
2. Disconnect the AC power cable from the instrument.

4.3 Trying Out the Instrument

This chapter describes some basic functions that you can perform with the R&S NGL/
NGM.
User Manual 1178.8736.02 ─ 06
Chapter 6.14, "Store and Recall
Getting Started
Trying Out the Instrument
",
on page 74.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ngm200 seriesNgl200 seriesNgl-com2aNgl201Ngl202Ngm201

Table of Contents