Platform Overload Recovery - Terex Genie GS-1330m Service And Repair Manual

Hide thumbs Also See for Genie GS-1330m:
Table of Contents

Advertisement

August 2021
47 When prompted, press and hold the Function
Enable and Platform Up buttons until the
platform reaches full height. When the
platform reaches full height, press the enter
button.
Note: If the Function Enable or Platform Up
buttons are released while the machine is
collecting data, the GCON LCD will prompt the
user to lower the platform for 5 seconds before
prompting to raise the platform to full height again.
48 When prompted, press and hold the Function
Enable and Platform Down buttons until the
platform is fully stowed. When the platform
reaches the stowed position, press the enter
button.
Note: If the Function Enable or Platform Down
buttons are released while the machine is
collecting data, the GCON LCD will prompt the
user to raise the platform for 5 seconds before
prompting to lower the platform to the stowed
position again.
49 When prompted, push the red Emergency
Stop button in to complete the No Load
Calibration procedure.
Part No. 1309020GT
9-16

Platform Overload Recovery

Message
If the ground controls LCD screen displays OL:
PLATFORM OVERLOADED, the emergency
lowering system has been used while the platform
was overloaded.
How to Clear the Platform
Overload Recovery Message
Note: This message shall be cleared by a person
trained and qualified on the troubleshooting and
repair of this machine.
Note: Use the following chart to identify the
description of each LCD screen control button
used in this procedure.
1
2
GS
-30m • 32m • 30 • 32 • 46 • 55
Service and Repair Manual
Scissor Components
Escape
Scroll up
Turn the key switch to the ground controls
position and pull out the red Emergency Stop
button to the on position at the platform
controls.
Press and hold the ground control scroll up
and scroll down buttons.
Scroll down
Enter
163

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents