1MRK 505 370-UUS Rev. K
12.1.3.5
Breaker-and-a-half
Figure
131
each of them handling voltage selection for WA1_QA1, TIE_QA1 and WA2_QA1 breakers respectively.
The voltage from busbar 1 VT is connected to V3PB1 on all three function blocks and the voltage from
busbar 2 VT is connected to V3PB2 on all three function blocks. The voltage from line1 VT is connected
to V3PL1 on all three function blocks and the voltage from line2 VT is connected to V3PL2 on all three
function blocks. The positions of the disconnectors and VT fuses shall be connected as shown in Figure
131.
Busbar protection REB670
Application manual
describes a breaker-and-a-half arrangement with three SESRSYN functions in the same IED,
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Section 12
Control
M12330-3 v8
273