Applicable Patterns - Daikin VAM-FA8VE Technical Data Manual

Heat reclaim ventilation
Table of Contents

Advertisement

9
Control System
1
9-3

Applicable patterns

9
9-3-1
Additional functions
Operation by power supply [HRV unit]
Purposes and functions
• The HRV unit is operated by "On / Off" of the main power
breaker. This is possible only for the independent
operation system. (When the main power is disconnected,
the transmission error will be displayed if the HRV unit is
interlocked to the indoor unit or controlled by the
centralized control.)
Cautions
1. Install insect control wire net on the air intake and
exhaust openings. (If the power is disconnected when
the damper is open, the damper remains open and the
insects may get into the room.)
2. When you install the remote control, it is possible to
have normal operation after the electric power
is supplied.
Monitor of operation (KRP50-2) [HRV unit → operating pilot lamp (local supply)]
Purposes and functions
To monitor the operation of one HRV unit.
Example of control wiring
Pilot lamp
Switch setting for HRV unit
• No change is required. (as per factory setting)
Optional accessories required
• Adapter PCB: KRP50-2
124
• HRV • VAM-FA8VE
power supply for pilot lamp
L
• HRV • Heat Reclaim Ventilation
Example of control wiring
J1 J2
SS1
X9A
X10A
HRV unit
Switch setting for HRV unit
The initial setting is required by the remote control for
indoor unit. Power-on setting..... "ON" [18(28)·1·02]
Install the remote control for indoor unit for the initial
setting. After completion of the initial setting, remove the
remote control.
Optional accessories required
• None
3P connector
X9A
2P connector
1
X10A
2
3
[KRP50-2]
JC
F1 F2
X11A
P1 P2
P1 P2
Remote control for indoor unit
(HC0030)
J1 J2
JC
F1 F2
SS1
X11A
P1 P2
HRV unit
P1 P2
Remote control for HRV unit
(HC0031)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vkm-gamv1Vkm-gav1

Table of Contents