Applicable Patterns - Daikin VAM-FA Technical Data Manual

Heat reclaim ventilation
Table of Contents

Advertisement

15
Control systems

15 - 4 Applicable patterns

15 - 4 - 1 Additional functions
Operation by power supply [HRV unit]
Purposes and functions
• The HRV unit is operated by "On / Off" of the main power
breaker. This is possible only for the independent operation
system. (When the main power is disconnected, the
transmission error will be displayed if the HRV unit is
interlocked to the indoor unit or controlled by the centralized
control.)
Cautions
1. Install insect control wire net on the air intake and exhaust
openings. (If the power is disconnected when the damper is
open, the damper remains open and the insects may get
into the room.)
2. When you install the remote control, it is possible to have
normal operation after the electric power is supplied.
Monitor of operation (KRP1C4/BRP4A50A) [HRV unit → operating pilot lamp (local supply)]
Purposes and functions
To monitor the operation of one HRV unit.
Example of control wiring
Pilot lamp
L
Switch setting for HRV unit
• No change is required. (as per factory setting)
Optional accessories required
• Adapter PCB: KRP50-2
• Heat reclaim ventilation • VAM-FA/FB
power supply for pilot lamp
[KRP1C4/BRP4A50A
• Ventilation • Heat reclaim ventilation
Example of control wiring
SS1
X9A
X10A
HRV unit
Switch setting for HRV unit
The initial setting is required by the remote control for indoor
unit. Power-on setting..... "ON" [18(28)·1·02]
Install the remote control for indoor unit for the initial setting. After
completion of the initial setting, remove the remote control.
Optional accessories required
• None
3P connector
X9A
2P connector
1
X10A
2
3
J1 J2
JC
F1 F2
X11A
P1 P2
P1 P2
Remote control for indoor unit
(HC0030)
J1 J2
JC
F1 F2
SS1
X11A
P1 P2
HRV unit
P1 P2
Remote control for HRV unit
(HC0031)
3
1
15
75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vam-fb

Table of Contents