Daikin VAM-FA8VE Technical Data Manual page 83

Heat reclaim ventilation
Table of Contents

Advertisement

7
Product Specification
7-2
Optional accessories
7-2-10 K-DGL100A, K-DGL150A, K-DGL200A, K-DGL250A: Air suction / discharge grill
Common works
Duct connection and ceiling board installation
1. Put the duct into the adapter and fix them by winding tape
around the joint.
(Suspend the duct from the ceiling to prevent any load from
being applied to the body.)
2. Install the ceiling board, providing a clearance of 2 to 5 mm
between the flange and the board.
(If no clearance is provided, maintenance of the unit cannot
be performed.)
Flange
Installation of the panel
Contract the panel spring and put it in the panel holder slot to
fix the panel.
Spring
• HRV • VAM-FA8VE
Duct
Tape
(HC0203)
Ceiling board
2 to 5 mm
clearance
(HC0204)
Slot
Panel
(HC0205)
• HRV • Heat Reclaim Ventilation
Installing the ceiling material and
gluing the wall paper
For installing the ceiling material
1. Cut the ceiling material to the following dimensions.
12 mm (Max.)
K-DGL100A
K-DGL150A
A
157
• Avoid using heavy (0.7 kg or more) or fragile material as the
ceiling material.
2. Remove the four screws and detach the panel.
Panel holder
3. Cut the panel along the groove.
4. Put the cut ceiling material and reassemble the panel.
(If the ceiling material thickness is not more than 12
mm, attach the provided packing to the rear side of the
panel holder.)
Panel holder
For gluing the wall paper
1. Prepare a piece of plywood of the same size as the ceiling
material.
2. Glue the wall paper to the plywood.
(The thickness after gluing the wall paper should not be
more than 12 mm.)
Plywood
(HC0206)
K-DGL200A, 250A
197
267
Screw
Straightening
plate
(HC0207)
(HC0208)
Screw
Ceiling material
(HC0209)
Wall paper
(HC0210)
C: 3K074171-1A
1
7
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vkm-gamv1Vkm-gav1

Table of Contents