Lockout/Tagout (LOTO) requirements

Follow all Lockout/Tagout requirements by ensuring you are in total control of the AC power plug at all
times during the service process.
To apply Lockout/Tagout (LOTO):
1.) Plan and prepare for shutdown.
2.) Shutdown the equipment.
3.) Isolate the equipment.
4.) Apply Lockout/Tagout Devices.
5.) Control all stored and residual energy.
6.) Verify isolation.
All potentially hazardous stored or residual energy is relieved.
ENERGY CONTROL AND POWER LOCKOUT FOR VIVID Q N.
WARNING
WARNING
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO
VOLTAGE GREATER THAN 30 VOLTS:
1. FOLLOW LOCK OUT/TAG OUT PROCEDURES.
TAG
&
LOCKOUT
2. TURN OFF THE BREAKER.
Signed
Date
3. UNPLUG THE Vivid q N.
4. MAINTAIN CONTROL OF THE POWER PLUG.
5. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE, AS THERE ARE NO TEST POINTS TO
VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL ON/OFF BUTTON WILL TURN OFF.
BEWARE THAT THE MAIN POWER SUPPLY AND BACK END PROCESSOR MAY BE ENERGIZED EVEN IF THE POWER
IS TURNED OFF WHEN THE CORD IS STILL PLUGGED INTO THE AC OUTLET.
1-18
2
EVISION
Section 1-6 - Lockout/Tagout (LOTO) requirements
V
N S
M
IVID Q
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fq000040

Table of Contents