Monitoring Tests; Accessing The Monitoring Diagnostic Test Options - GE Vivid q N Service Manual

Hide thumbs Also See for Vivid q N:
Table of Contents

Advertisement

GE
D
FQ091019, R
IRECTION
Section 7-5

Monitoring Tests

7-5-1

Accessing the Monitoring Diagnostic Test Options

Access the Diagnostic Test window, as described in the Accessing the Front End Diagnostic
Options section, on page 7-25.
7-5-1-1
Full System Monitoring Test
NOTE:
For a description of this test, refer to the information in
7-14.
1.) In the Diagnostic Test window, trackball to Full System Monitoring Test in the list of Monitoring
tests available for selection from the Diagnostic Test Tree (see
The Full System Monitoring Test name is displayed under Execute; all system components to be
tested are highlighted light blue in the Schematic View, as shown below:
2.) As indicated in the Special Instructions area, disconnect any probes currently connected to the
system and make sure that nothing is touching the probe connectors.
3.) Under the Special Instructions area, activate the Loops checkbox
and select the required number of Loops from the combo box.
4.) Adjacent to On Fail, select either Stop or Continue, as required.
Stopping on failure enables you to review a failed test, the moment it fails. Alternatively, you may
prefer testing to continue on failure and later you may review the report.
5.) Trackball to the Start button and press Set.
The Full System Monitoring Test commences. While the test proceeds, the name of the test currently
in progress (ADC Test) is displayed in the Execute field and the current Loop # and specific test are
7-86
2
EVISION
Figure 7-57 Full System Monitoring Test
Section 7-5 - Monitoring Tests
V
IVID Q
"Full System Monitoring Test" on page
Figure 7-57
N S
M
ERVICE
ANUAL
below) and press Set.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fq000040

Table of Contents