GE Vivid q N Service Manual page 581

Hide thumbs Also See for Vivid q N:
Table of Contents

Advertisement

GE
D
FQ091019, R
IRECTION
8) Loosen and remove the ground screw fastened to the AC Distribution Assembly - see
Figure 8-88 AC Distribution Assembly and Cable Sockets
Peripheral power
cable
Jumper
AC Assembly mounting
screw
9) Loosen and remove the two AC Assembly mounting screws that secure the AC Distribution
Assembly to the mounting bracket on the SafeLock Cart chassis - see
10) Carefully pull the AC Distribution Assembly out towards you and remove it remove from the
SafeLock Cart.
8-4-7-4
AC Distribution Assembly Installation Procedure
1) Return the replacement AC Distribution Assembly to its position on the SafeLock Cart chassis and
secure it on the mounting bracket using the two screws (previously removed - see
above).
2) Fasten the Ground screw to the AC Distribution Assembly -
3) Reconnect the peripheral power cable to the AC Distribution Assembly -
4) Secure all cables in position with new cable ties.
5) Return the AC Assembly cover and fasten the three screws (previously removed).
6) Return the Lower Cover (Rear), as described in the
page
7) Return the Upper Cover (Rear), as described in the
page
8) Reconnect the AC power cable to the AC Distribution Assembly at the base of the cart (rear) and
turn ON power to the SafeLock Cart.
9) Proceed to perform the following functionality tests:
-
-
2
EVISION
8-73.
8-66.
"SafeLock Cart - Grounding Continuity" on page 10-22
"SafeLock Cart - Chassis Current Leakage Test" on page 10-24
Chapter 8 - Replacement Procedures
V
IVID Q
Figure
Figure
8-88, above.
Figure
"Lower Cover (Rear) Installation Procedure" on
"Upper Cover (Rear) Installation Procedure" on
N S
M
ERVICE
ANUAL
Figure
8-88.
Ground Screw
AC Assembly mounting
screw
8-88.
Figure
8-88,
8-88, above.
8-75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fq000040

Table of Contents