GE Vivid q N Service Manual page 556

Hide thumbs Also See for Vivid q N:
Table of Contents

Advertisement

GE
D
FQ091019, R
IRECTION
8-3-5-5
DC-to-DC Power Supply Installation Procedure
NOTE:
When performing the following installation procedure steps, it may be helpful to review the
appropriate movie clips previously referenced in the
Procedure.
1) Return the HVPS to its original position - refer to
2.) Return the five screws and fasten the HVPS in position on the Bottom Assembly, as shown in
8-57 on page
3.) Reconnect each of the two Power Supply cables to the DC Power Supply (HVPS-to-BEP and
HVPS-to-RFI), as shown in
4.) Return the bearing handle, as described in the
8-3.
5.) Make sure the Vivid q N LCD Display cover is securely closed and place the scanner face down.
Re-install the battery as described in the
6.) Proceed to perform the following functionality tests:
-
-
-
-
8-50
2
EVISION
8-49.
"SafeLock Cart - Grounding Continuity" on page 10-22
currently mounted on the SafeLock cart
"SafeLock Cart - Chassis Current Leakage Test" on page 10-24
"Calibration Tests" on page 7-25
"Full System Test" on page 7-10
Section 8-3 - Internal Component Replacement Procedures
DC-to-DC Power Supply Removal
Figure
Figure 8-56 on page
8-48.
"Bearing Handle Installation Procedure" on page
"Battery Installation Procedure" on page
V
N S
IVID Q
8-58, above.
- only if the Vivid q N system is
M
ERVICE
ANUAL
Figure
8-5.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fq000040

Table of Contents