GE Vivid q N Service Manual page 430

Hide thumbs Also See for Vivid q N:
Table of Contents

Advertisement

GE
D
FQ091019, R
IRECTION
7-4-5-2-4
ACW Pre-Mixer Gain Test
NOTE:
For a description of this test, refer to the information in
13.
NOTE:
When performing this test, no probe should be connected to the system and nothing should be
touching the probe connectors!
It is necessary to disable the Loop option where it should not be used.
After performing this test, you must re-boot the system and perform the DC Offset Calibration procedure
as described in
1.) In the Diagnostic Test window, trackball to ACW Pre-Mixer Gain Test in the list of ACW tests
available for selection from the Diagnostic Test Tree (see
ACW Pre-Mixer Gain Test name is displayed under Execute; the relevant system components to
be tested are highlighted light blue in the Schematic View (P&M), as shown below:
2.) As indicated in the Special Instructions area, disconnect any probes currently connected to the
system and make sure that nothing is touching the probe connectors.
3.) Adjacent to On Fail, select either Stop or Continue, as required. Stopping on failure enables you
to review a failed test, the moment it fails. Alternatively, you may prefer testing to continue on failure
and later you may review the report.
4.) Trackball to the Start button and press Set.
7-72
2
EVISION
"DC Offset Calibration" on page
Figure 7-45 ACW Pre-Mixer Gain Test
Section 7-4 - Performing Front End (FE) Diagnostics
"ACW Pre-Mixer Gain Test" on page 7-
7-25.
Figure 7-45
V
N S
M
IVID Q
ERVICE
ANUAL
below) and press Set. The

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fq000040

Table of Contents