GE Vivid q N Service Manual page 402

Hide thumbs Also See for Vivid q N:
Table of Contents

Advertisement

GE
D
FQ091019, R
IRECTION
As the testing sequence progresses, the progress bar will advance to reflect the test progress. The
LED on the RFI status indicator in the Data Flow map will be highlighted in the appropriate color to
indicate the current test status, as follows:
When the upper progress bar reaches approximately midway in the Status area, a loud,
high-pitched sound will be heard coming from the speakers.
NOTE:
If no sound is heard, it is necessary to perform the BEP Audio Test as described in
on page
"Performing Back End Diagnostics on the System" on page
6.) At any stage, trackball to the Pause button and press Set, if required.
7.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the RFI Audio Test sequence is complete:
-
-
NOTE:
For this test, this one report (Demodulator Short Test report) which is listed in the Reports
window on the right. By default, this report is displayed in the Reports window below, as shown
in the example in
7-44
2
EVISION
Green:
All recommended tests for these components have been completed and no problems
were identified.
Red:
Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
7-132. In the event this test also fails, the problem is probably in the BEP - refer to
the Diagnostic Test window displays the Finished message
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in
Figure 7-20 View Test Log - RFI Audio Test
Figure
7-20.
Section 7-4 - Performing Front End (FE) Diagnostics
V
N S
IVID Q
"Audio Test"
7-108.
Figure
7-20.
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fq000040

Table of Contents