Deck Lift Lever Installation - Toro Z Master Z400 Series Service Manual

Hide thumbs Also See for Z Master Z400 Series:
Table of Contents

Advertisement

CHASSIS
13. Remove the retainer clip from the lift lever grip
assembly (Fig. 125).
3
14. Carefully slide the lift lever grip assembly out of its
carrier frame pivot (Fig. 126).
3-28
Fig 125
PICT-0059 rev
Fig 126
PICT-0060
15. Inspect the deck lift lever assembly components for
wear, especially the bushings (Fig. 127).
B C D E
A
Fig 127
A. Lift Handle Assembly
B. Nuts
C. Bolts

Deck Lift Lever Installation

1. Install the bracket that supports the lower RH corner
of the panel assembly (Fig. 128).
Fig 128
Z Master Z400 Service Manual
F
PICT-0061 rev
D. Plates
E. Bushings
F. Retainer Clip
PICT-0055

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z 400 estate seriesZ 450 pro performance seriesZ 100 seriesZ 440 pro value series

Table of Contents