Toro Z Master Z400 Series Service Manual page 106

Hide thumbs Also See for Z Master Z400 Series:
Table of Contents

Advertisement

6. Install the cog belt onto the pump drive and idler
pulleys. With a spring puller, install the extension
spring onto the idler arm assembly (Fig. 276).
Fig 276
7. Install the electric PTO clutch (Fig. 277).
Fig 277
Z Master Z400 Service Manual
8. Install the center bolt and two spring washers that
hold the electric PTO clutch to the engine crankshaft
(Fig. 278).
PICT-0016c
9. Torque the center bolt to 55 ft-lbs. (74.6 Nm) (Fig.
279).
PICT-0015c
ENGINE
Fig 278
PICT-0014c
Fig 279
PICT-0027c
5
5-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z 400 estate seriesZ 450 pro performance seriesZ 100 seriesZ 440 pro value series

Table of Contents