CHASSIS
4. Loosen jam nuts on the deck lift rods until the
deck support springs are fully extended. Repeat
procedure for both deck lift rods (Fig. 117).
3
5. Remove the hex nut from RH rear deck lift assembly.
Repeat procedure for LH rear deck lift assembly
(Fig. 118).
3-26
Fig 117
PICT-0049
Fig 118
PICT-0050
6. Remove the two 4" x 4" blocks at the rear of the
deck, leaving the blocks in place at the front of the
mower deck. The mower deck linkage should now
be fully unloaded (Fig. 119).
Fig 119
7. Remove hex bolt, nut, and lift lever bushing from the
lower deck lift plate mounting location (Fig. 120).
Fig 120
Z Master Z400 Service Manual
PICT-0051
PICT-0053